$8.1M Highland Hospital ICU Renovation in Rochester Needs 5 Low Voltage Systems
Permit records show an $8.1M West Wing ICU relocation at Highland Hospital in Rochester, NY — floors 4-7 refurbished in phases, requiring 5 low voltage systems with an estimated $490K in LV work.
Jul 14, 2026
Google Journey Haskell Data Center Low-Voltage Watch
TDLR records show two Google-linked Journey data-center filings in Haskell County: $800M, 495,702 sq ft, Housebound Group LLC as owner, HDR as design firm, and open low-voltage package names.
Jul 14, 2026
LVN Signal Now Tracks Cleveland, Ohio: Real-Time Construction Intelligence for Low Voltage Contractors
Cleveland, Ohio is now live on LVN Signal. Low voltage contractors in the Cleveland metro now have real-time construction intelligence covering 1,600+ active projects worth $660M+, with 99 new this week — as Cleveland rides its strongest building cycle in years.
Jul 13, 2026
$3B Prime Data Centers PHX01 Campus in Avondale Needs 10 Low Voltage Systems
Prime Data Centers broke ground on its $3B PHX01 hyperscale campus in Avondale, Arizona — five buildings, 240 MW, and 20 data halls requiring 10 low voltage systems with an estimated $120M in LV work.
Jul 13, 2026
New Era TCDC Odessa AI Campus Low-Voltage Watch
New Era's TCDC campus outside Odessa has a land trail, Stream LOI, Energy Dome MOU, 1+ GW planned scale, and open low-voltage package names.
Jul 13, 2026
$30M D'Youville Osteopathic Medical School in Buffalo Is an AV-Heavy Low Voltage Opportunity
Permit records show a $30M interior build-out of D'Youville University's new College of Osteopathic Medicine at 285 Delaware Avenue in downtown Buffalo — an AV-heavy, simulation-driven low voltage opportunity estimated at $2.1M. Here's what low voltage and AV integrators need to know.
Jul 12, 2026
Decimal Eagle Ridge Monroeville Data Center Watch
Decimal Digital's Project Eagle Ridge is a planned Monroeville AI data-center watch with a 30 MW starting load, 100 MW target, 69 kV line, substation, and open trade packages.
Jul 12, 2026
Why AI Data Centers Need So Much Fiber
AI does not have a special appetite for glass. Distributed compute adds a backend fabric, more tiers, more distance, and far less room for casual workmanship.
Jul 11, 2026
$4.6B Fleet AI Data Center Near Reno Needs 10 Low Voltage Systems
Fleet Data Centers' South Valley campus — a $4.6B, 230 MW AI data center at the Tahoe-Reno Industrial Center in Storey County, NV, fully pre-leased to an investment-grade tenant — requires ten low voltage systems with an estimated $184 million in LV work. Here's what low voltage contractors need to know.
Jul 11, 2026
Edged Fort Worth Data Center Low-Voltage Watch
Edged Energy Outpost in Fort Worth has a TDLR filing for a 488,770 sq ft data center, $300M estimated cost, MG2 as design firm, and a broader $1.1B two-phase city-agreement context, while specialty low-voltage package names remain open.
Jul 11, 2026
$10B Meta Lebanon AI Data Center in Indiana Needs 10 Low Voltage Systems
Meta's Lebanon, Indiana campus — a $10B, 1 GW AI data center at the state's LEAP district with 10 data centers across 1,500 acres — requires ten low voltage systems with an estimated $400 million in LV work. Electrical prime Faith Technologies is already on site. Here's what low voltage contractors need to know.
Jul 10, 2026
Amazon Project Eagle Boling Data Center Watch
Amazon Project Eagle in Boling, Texas has four TDLR data-center filings totaling about 756,240 square feet and $1.2B in estimated building value, with Gensler named as design firm and specialty package names still open.
Jul 10, 2026
$62.1M Sutter Health Sports Medicine Complex in Sacramento Needs 5 Low Voltage Systems
Permit records show a $62.1M build-out of Sutter Health's new Advanced Orthopedics & Sports Medicine Care Complex at 660 J Street in downtown Sacramento, requiring five low voltage systems including nurse call, clinical AV, and security, with an estimated $3.7M in LV work. Here's what low voltage contractors need to know.
Jul 9, 2026
Meta Sturgeon County AI Data Centre Watch
Meta Sturgeon County is a 1GW Canadian AI data-centre watch with Pembina Greenlight power context and unresolved specialty package names.
Jul 9, 2026
$25B Vantage Frontier AI Data Center in Texas Needs 10 Low Voltage Systems
Vantage Data Centers' Frontier — a $25B, 1.4 GW Oracle-OpenAI Stargate AI data center near Abilene, TX and the largest campus in Vantage's global portfolio — requires ten low voltage systems with an estimated campus-wide LV opportunity approaching $1 billion. Here's what low voltage contractors need to know.
Jul 8, 2026